Canal River Extension

This project comprised of Oklahoma River Canal being extended north to the existing Bricktown Canal. The new extension of the canal runs under the relocated I-40 and terminates in a cul-de-sac designed for the Devon River Cruises. Design also included pedestrian & vehicular bridges/walkways, landscaping, lighting, water features, retaining walls, stairs, and an elevator.